Things were pretty busy down at the Ice Palace building site. Ice blocks were being cut, removed, transported and stored at the rate of one every minute
Ancient gas-powered ice cutter
Kicks up a spray
Make the smaller cuts by hand
Block guided through a channel of water clear of ice
The 400 lb block of ice finally arrives at the shore
Ice block placed into the waiting loader
2 comments:
Wow - neat to see the process. Thanks for posting this. I had wondered about some of the logistics.
Very nice bllog you have here
Post a Comment